Laserfiche WebLink
December 14, 2006 <br />Mr. Steve Fancher <br />LOVELAND READY MIX <br />P.O. Box 299. <br />Loveland, CO 80539-0299 <br />RE: <br />Resurvey of Gas Line Monitoring Points Batch Plant Site, Weld County Road 54 CDS <br />Project No. P02-1783 <br />Dear Mr. Fancher: <br />This letter is to state the results of the checking of the gas line monitoring points set <br />in March of 2002. In April 19, 2006, a survey of Points 1 through 10 showed no significant <br />difference or movement from the original survey. Currently, the only extraction areas were <br />adjacent to Points 1 through 10. <br />If you have questions regarding this information, please call our office. <br />Sincerely, <br />FOR AND ON BEHALF OF <br />CDS ENGINEERING CORPORATION <br />ichael J. eDecker PLS 20676 <br />urv ey Supervisor <br />165 2nd Street S. W. - Loveland, CO 80537 • (970) 667-8010 - Fax: (970) 667-8024