Laserfiche WebLink
1 <br />ROADABLE EQUIPMENT . sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />I Cost/hr/fleet <br />-Generic 12-18 cy, 6x4 $82.82 4 $331.29 $331.29 <br />-Light Duty Pickup, 4x4, 314 T. $30.93 1 $30.93 $30.93 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $362.22 $362.22 <br />EQUIPMENT HAUL DISTANCE and TIME ... .... <br />Nearest major city or town within project area region <br />Transportation Cvcle Time Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 0.30 0.30 Total non-roadable mob/demob cost " <br />Return time (hours) = 0.30 0.30 • two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost ** <br />Unloading time (hours) = 1.00 NA •• one round trip, no haul rig <br />Subtotals = 2.60 0.60 <br />................. <br />.....,.... <br />JOB TIME AND COST Total job time <br />Total job cost <br />Natutita <br />12.0 miles <br />40.0 mph <br />$2,736.89 <br />$217.33 <br />5.20 hours <br />2,954