Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATIO <br />PROJECT IDENTIFICATION <br />sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Task 008 State : Colorado Permit/job #: M-2000-049 <br />Date : 06/05/2008 County :Montrose Abbreviation :none <br />User : KAP Site :Angie Pit Filename:/W049-008 <br />Permit or other job action :Amendment <br />Task description :Mobilize/Demobilize <br />EQUIPMENT TRANSPORT RIG COST <br />i <br /> Sh <br />ft basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16 <br />63 $18 <br />3 <br /> . . <br />7 $22.33 <br /> Operating cost/hour : $44.38 $46.13 $50.07 <br /> Operator cost/hour : $27:66 $27.66 $27.66 <br /> Helper cost/hour : $0.00 $25.39 $25.39 <br /> Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description <br />-Cat D8R Series 11- 8SU <br />20 Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />( <br />-CAT 966G (2002) <br />-Revegetation equipment 52.55 <br />25.10 <br />20.00 $50.32 <br />$29.49 <br />$20.00 $125.45 <br />$117.55 <br />$88.67 1 <br />1 <br />2 $175.77 <br />$147.04 <br />$217.34 $125.45 <br />$117.55 <br />$177.34 $0.00 <br />$0.00 <br />$0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $540.15 $420.34 $0.00