Laserfiche WebLink
DBMS Comment 2) - Piezometer Data - The GMR cover letter (page 2) states that <br />"Piezometers inside the slide area tend to have higher psi readings than those outside <br />the slide area." The data presented for 07-GI3 (inside the slide) are indeed higher than <br />the measurements reported for 07-GX5 (outside the slide), but the pore pressure <br />readings for 07-GI10 (also inside) are more similar to 07-GX5 than they are to 07-GI3. <br />Please reconsider the statement referenced above and rephrase if necessary. The <br />comment was merely an observation that is generally true. While the values for the <br />deepest zone, Q seam, are similar for GI10 (inside the slide) and GX5 (outside the slide), <br />the values in the middle zone are noticeably higher in GI10 than they are in GX5. I <br />would prefer to leave the March 2008 cover letter as is; however, in the future I will <br />refrain from making observations that may not add a lot of value to the report. <br />DRMS Comment 3) - Piezometer Data - page 2 of the GMR cover letter states <br />"Readings from the Z pit piezometer indicate insignificant amounts of pore pressure. <br />This piezometer was inadvertently destroyed in September and is currently inactive." <br />The Piezometer Data spreadsheet reports zero value for pore pressures in the Z pit <br />piezometer (07-ZI2) prior to the date at which it was destroyed. Please provide the data <br />(if any) that were collected for 07-ZI2 prior to the time the piezometer was destroyed. <br />This piezometer was monitored in June, July and August of 2007. In June there was no <br />pore pressure (the hole was dry as expected). In July there was a low reading of 0.09 psi <br />in the deepest zone. In August, there was no pressure again. The zeroes that you see on <br />the report are the readings for this piezometer. <br />DRMS Comment 4) - Bench Marks - Page 3-27a describes the planned construction of <br />19 holes, of which three (3) will be fitted with inclinometers and four (4) with <br />piezometers. In addition, page 3-27a states, "all the sites will have surface benchmarks." <br />The March 2008 GMR indicates that all 19 holes were drilled between late February <br />and late July of 2007. Inclinometers and piezometers were installed as planned; <br />however the actual number of benchmarks established is only nine (9) rather than the <br />19 described in the permit. The number of surface bench marks installed is less than <br />half the number that was committed ton (9 versus 19) in TR-99. Please explain to the <br />Division both the reasoning behind and proposed justification for this variance. <br />Trapper generally has not established benchmarks at sites where other instrumentation <br />exists (GI2, GI3, GX5, GX6, ZIl, ZI2). Instead, Trapper has been monitoring additional <br />sites as described below: <br />Type <br />Reflector <br />Reflector <br />Reflector <br />Reflector <br />Sign <br />GI4 post <br />Post <br />Post <br />05-Gl-CCR <br />Location <br />404,637N, 1,436,583E <br />403,950N, 1,436,703E <br />404,130N, 1,437,107E <br />403,350N, 1,437,980E <br />401,123N, 1,437,149E <br />402,202N, 1,437,957E <br />402,909N, 1,435,619E <br />402,217N, 1,436,307E <br />403,209N, 1,437,588E <br />Multiple readings have been taken at these sites as is evidenced by the attached tables. <br />Locations of these sites are shown on the attached photo (highlighted in green). When