My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-22_PERMIT FILE - P2008046
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2008046
>
2008-09-22_PERMIT FILE - P2008046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:29 PM
Creation date
9/29/2008 10:41:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
PERMIT FILE
Doc Date
9/22/2008
Doc Name
Final reclamation cost estimate
From
DRMS
To
American Shale Oil, LLC
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis :-I per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $62.35 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $198.40 Total fleet cost/hour : $198.40 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 10,000 CCY factor : 1.115 volume : 11,150 LCY <br /> <br />Source of estimated volume: MWP Pad Plan <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 300 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 437.8 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rl) <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,900 feet Material weight : 0.92 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,500 Ibs/LCY Net correction : 0.43 <br />Weight description <br />Clay - Dry Adjusted unit production : 188.81 LCY/hr <br /> Adjusted fleet production : 188.81 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 59.05 Hours <br />Unit cost : $1.051 /LCY Total job cost : $11,716 <br />
The URL can be used to link to this page
Your browser does not support the video tag.