My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-22_PERMIT FILE - P2008046
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2008046
>
2008-09-22_PERMIT FILE - P2008046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:29 PM
Creation date
9/29/2008 10:41:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
PERMIT FILE
Doc Date
9/22/2008
Doc Name
Final reclamation cost estimate
From
DRMS
To
American Shale Oil, LLC
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 04a State :Colorado Permit/job# P-2008-046 <br />Date : 0911912008 <br />User: THM <br />Abbreviation :none <br />Filename :P046-04a <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br />Data source:- (CRG) <br />Cost Breakdown : Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 29,844 CCY <br />Utilization % <br />$62.35 NA <br />$103.27 100 <br />$0.00 NA <br />$32.78 NA <br />$198.40 Total fleet cost/hour : $198.40 <br />Loose <br />factor : 1.115 volume : 33,276 LCY <br />Source of estimated volume: HB Pad Plan <br />Source of estimated swell factor :CAT Handbook <br />...>:... <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Average push distance : 300 feet <br />Unadjusted hourly production :--437-8 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />C/av - Dry <br />County :Rio Blanco <br />Site :Amso Rd & D Protect <br />5.00 % (ne <br />6,910 feet <br />2,500 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />0.90 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (1 shift/day) <br />0.80 (fnd-rl) <br />1.11 (Cat HB) <br />1.00 (Cat HB) <br />0.92 (Cat HB) <br />1.00 (S/SU/U) <br />0.46 <br />Adjusted unit production : 201.28 LCY/hr <br />Adjusted fleet production : 201.28 LCY/hr <br />Total job time : 165.32 Hours <br />Unit cost : $0.986 /LCY Total job cost : $32,799
The URL can be used to link to this page
Your browser does not support the video tag.