Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />.... > ....... <br />PROJECT IDENTIFICATION <br />Task # : 08a State :Colorado Permit/job# :P-2008-046 <br />Date <br />User <br />09/19/2008 <br />THM <br />County: Rio Blanco Abbreviation :none <br />Site :Amso Rd & D Project Filename :P046-08a <br />Agency or organization name: DRMS <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description :Spread topsoil over 2.5 acres of MWP Pad <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $62.35 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $198.40 Total fleet cost/hour : $198.40 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,025 CCY factor : 1.215 volume:' 3,675 LCY <br />Source of estimated volume :8" topsoil over 2.5 acres <br />Source of estimated swell factor :CAT Hanbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 300 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 437.8 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,900 feet Material weight : 1.44 (Cat HB)_ <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.75 <br />Weight description <br />Top Soil Adjusted unit production : 327,80 LCY/hr <br /> Adjusted fleet production : 327.80 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 11.21 Hours <br />Unit cost : $0.605 /LCY Total job cost : $2,225