My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-22_PERMIT FILE - P2008046
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2008046
>
2008-09-22_PERMIT FILE - P2008046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:29 PM
Creation date
9/29/2008 10:41:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
PERMIT FILE
Doc Date
9/22/2008
Doc Name
Final reclamation cost estimate
From
DRMS
To
American Shale Oil, LLC
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name: DRMS <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description : Spread topsoil over 3.7 acres of HB Pad <br />Xx. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis :-I per day <br />Attachment no. 2 :NA <br /> Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $62.35 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : <br />X, $198.40 Total fleet cost/hour : <br />:X $198.40 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4,477 CCY factor : 1.215 volume : 5,440 LCY <br />Source of estimated volume :8" topsoil over 3.7 acres <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 300 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 437.8 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-ro _ <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,910 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.75 <br />Weight description <br />Top Soil Adjusted unit production : 327.80 LCY/hr <br /> Adjusted fleet production : 327.80 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 16.59 Hours <br />Unit cost : $0.605 /LCY Total job cost : $3,292
The URL can be used to link to this page
Your browser does not support the video tag.