Laserfiche WebLink
2. PUMPAGE RATES FROM THE MINE TO THE SEDIMENT PONDS WILL BE RECORDED <br /> WITH THE MINE WATER TESTED OUARTERLY FOR FIELD PARAMETERS AND ONCE <br /> YEARLY FOR THE FULL SUITE OF CHEMICAL PARAMETERS. <br /> 3. THE GEOTECH WELL, LOCATED AT THE PROJECTED BASE OF THE REFUSE PILE <br /> AND COMPLETED IN THE ALLUVIUM, WILL BE SAMPLED MONTHLY FOR WATER LEVEL <br /> AND FIELD PARAMETERS AND OUARTERLY FOR FULL SUITE CHEMICAL PARAMETERS. <br /> FIELD PARAMETERS FULL SUITE CHEMICAL PARAMETER <br /> TEMPERATURE pH MAGNESIUM <br /> pH TEMPERATURE SULFATE <br /> CONDUCTIVITY SPECIFIC CONDUCTANCE FLUORIDE <br /> FLOW OR WATER LEVEL DISSOLVED SOLIDS BORON <br /> SODIUM ALKALINITY <br /> POTASSIUM BICARBONATE <br /> CALCIUM <br /> The requirements of original Stipulation No. 1 have been modified by <br /> Technical Revisions 03 (in April , 1988) and 04 (in June, 1988). <br /> STIPULATION NO. 3 <br /> SEDIMENT POND SP-1 AND SP-2 WILL BE MAINTAINED WITH SEDIMENT AT OR <br /> BELOW THE 60 PERCENT LEVEL. <br /> -3- <br />