My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-02-01_GENERAL DOCUMENTS - C1984063
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1984063
>
1990-02-01_GENERAL DOCUMENTS - C1984063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 8:56:33 AM
Creation date
9/26/2008 12:38:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
General Documents
Doc Date
2/1/1990
Doc Name
Proposed Decision & Findings of Compliance for RN1
Permit Index Doc Type
Findings
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XXI. Bonding - Rule 2.05.4(2)(d) <br /> The Division recalculated Eastside Coal Company's reclamation costs for the <br /> permit renewal . Including projected facilities (loadout, refuse disposal <br /> area, office complex), the costs are estimated at $40,818.70, rounded down to <br /> $40,000.00. The permittee is currently bonded for $40,000.00, which is <br /> considered to be adequate to cover costs of reclamation. <br /> The operation is in compliance with the requirements of this section. <br /> XXII. Sealing of Drilled Holes and Underground Openings - Rules 2.05.4(2)(9) <br /> an <br /> Stipulation No. 12, requiring a detailed plan for sealing of the mine portals, <br /> was satisfied with a submittal from Eastside dated April 14, 1985. No other <br /> changes are required to this section. <br /> The operation is in compliance with the requirements of this section. <br /> XXIII. Subsidence - Rules 2.05.4(6) and 4.20 <br /> Stipulation No. 11 of Eastside's original Findings Document was satisfied by <br /> submittal on January 30, 1985 of a replacement permit application page <br /> committing the operator to implement the proposed subsidence monitoring <br /> schedule. Only one monitoring point currently lies within the potential <br /> subsidence area, and no major changes are noted. Monitoring continues on a <br /> semi-annual schedule during periods of cessation of mining, and quarterly when <br /> the mine is active. <br /> The operation is in compliance with the requirements of this section. <br /> XXIV. Special -Categories of Mining - Rules 2.06, 4.22, 4.23, 4.26, 4.27, <br /> and 4.29 <br /> No changes are required to this section. The operation is in compliance with <br /> the requirements of this section. <br /> XXV. Miscellaneous Compliance - Rules 2.05.6(5) , 4.02, 4.12, 4.19, 4.21 , <br /> There are no changes necessary to this section. The operation is in <br /> compliance with these requirements. <br /> XXVI. Operation on Lands Subject to Limitations or Prohibitions - Rules <br /> 2.03.7 an <br /> There are no changes necessary to this section. The operation is in <br /> compliance with these requirements. <br /> XXVII. Demonstration That Surface Coal Mininq and Reclamation Operations Can <br /> e Feasibly ccomp is a - u e .b <br /> -1 1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.