Laserfiche WebLink
please submit a plan to stabilize the topsoil stockpile, include the type of seeds that will be used and the rate it <br />will be planted, and/or any means that will be used to stabilize the topsoil pile. <br />Upon inspection of the site, it was noted that the current topsoil pile has been partially relocated. <br />According to Rule 3.1.9 (4), once the topsoil is stockpiled, it must be re-handled as little as <br />possible, and if it is to be relocated, the operator will need to obtain Office approval through a <br />Technical Revision to the permit. On the mining plan map please locate where the various <br />topsoil piles will be located. <br />2. Will any water diversions or impoundments be installed during the mining and reclamation process? If yes, <br />please describe these structures and include them on the mine plan map. <br />3. If any overburden is salvaged during the operation, it will need to be stockpiled separately from the topsoil. <br />Please indicate on the mine plan map where the overburden will be stockpiled. <br />4. Will any of the material be processed on the site? If yes, please describe the equipment that will be used and <br />display where it will be located on the mine plan map. <br />Upon inspection of the mine site, it was noticed that the operator currently mixes the mined <br />material with ground up asphalt or "Roto-Millings". Even though this material is not directly <br />backfilled onto the site, it may be stockpiled on the site from time to time, and during the mixing <br />process it appear that the material has been compacted into the top layer of soil. Please submit a <br />Notice to the office that is similar to the one cited in Rule 3.1.5 (9). This is described as follows: <br />a) A narrative that describes the location of the proposed activity <br />b) Approximate volume of material to be mixed with the mine material <br />c) A signed affidavit certifying that the material is clean and inert, as defined in Rule <br />1.1(20) (A copy of this definition will be enclosed in with the inspection report) <br />d) The approximate date the proposed activity will commence and end, however, <br />such dates shall not be an enforceable condition. (Please provide a rough estimate <br />of when these activities will occur) <br />e) (This section is not applicable since the operator will not use this material as <br />backfilling material) <br />f) (This section is not applicable since the operator will not use this material as <br />backfilling material)