Laserfiche WebLink
on the Level 6 pad surface for short periods of time, and then transferred to haul trucks. <br />Ore will be transported via rail to a facility for crushing and. processing. The Level 6 pad <br />is `capped' with inert material (approximate depth of 6" upwards to 12") underlain by <br />historic waste rock. In addition, the Level 6 pad is designed to prohibit stormwater from <br />pooling and being released to offsite areas. The pad represents a contained setting to <br />manage ore handling. <br />Item 20: First entry, Page 3. <br />"Please update the emergency response plan information. " <br />RESPONSE: Richmont Mines Inc. has provided their Emergency response plan <br />information and is now contained within the attached Emergency Plan Documentation. <br />Page 8 of 9