will take an additional 10 years due to the proposed western expansion. Connell anticipates that <br />they will continue to mine approximately 1 to 2 acres per year or approximately 71,000 cubic <br />yards of material per year. This schedule anticipates completion of mining and reclamation in 10 <br />years for a total of approximately 425,000 cubic yards of material. However, it is possible that <br />due to market fluctuations, mining will progress slower or faster than anticipated and additional <br />or less time could be required for mining and reclamation of the site. <br />A total of approximately 33 acres will eventually be mined on the site. The remaining <br />undisturbed area of the existing permit will be mined in Phase 2 over the anticipated span of 1 to <br />2 years. During Phase 3, mining of the proposed western expansion area will begin near the <br />southwest corner of the expansion area and will progress in an easterly direction as shown in <br />Exhibit C (Mining Plan Map). The western expansion area will be mined over the anticipated <br />span of 8 to 9 years. A permanent asphalt batch plant is located on the east side of the site, and <br />an existing access road will be used to allow traffic to and from the plant, as shown in Exhibit C. <br />The truck traffic patterns and volumes will remain unchanged. The current alignment of the <br />access road may change as mining progresses. <br />Mining Methods <br />The deposit will be dry mined, and the area will be reclaimed as cropland and grazing lands. <br />The equipment and facilities may include, but are not limited to the following: <br />Processing Equipment <br />Screen, crusher, log washer, sand screw, conveyors, and other miscellaneous processing <br />equipment. <br />Earth Moving Equipment <br />Dozers, loaders, scrapers, excavators, and compactors will be used for mining and earth <br />1 moving operations. <br />Asphalt Batch Plant <br />Loader, skidsteer, control house, (2) silos, coldfeeds, lime system, bag house, mixing <br />chamber with burner, (3) hot oil tanks and a fuel tank. <br />Miscellaneous <br />An employee/storage trailer, scale house, and scale, will be located on-site. Generators and <br />watering trucks will be used as needed. <br />As mining progresses, topsoil and overburden will be stripped with excavators and haul trucks to <br />expose the aggregate product below. All topsoil and overburden material will be used on-site for <br />reclamation so long-term stockpiling of these materials is not anticipated. If stockpiles do <br />remain for over 180 days they will be seeded per the seed mixture and rate described in the <br />reclamation. <br />Mining of the aggregate will progress down to the underlying bedrock. During mining and prior <br />to reclamation, the mining face will be a nearly vertical at an approximate 1/2H:1 V slope. The <br />Camilletti Pit <br />DRMS 112 Permit Amendment <br />Page 6