Laserfiche WebLink
Mike Boulay -8- August 19, 2008 <br />in the Division's original request. Also, please amend the seedmix <br />reference on page 3-7 to be consistent with the Table 3.4-2 seed mix. <br />CAM: Temporary seeding is discussed on page 2-35, however for clarity, <br />reference to Table 3.4-2 was added to page 2-35. Page 3-7 was updated to <br />reference Table 3.4-2. <br />48. Item Resolved. <br />49. DRMS: The Division requested narrative clarification regarding reclamation <br />fencing locations and specifications, with fence locations to be depicted on <br />Exhibit 3.1-1. The operator included a narrative response with a generalized <br />description of the reclaimed area fencing, but the permit text on page 3-16 was <br />not amended as requested and the fencing locations were not depicted on the <br />amended Figure 3.1-1 as requested. <br />Please amend the plan as warranted, and depict new fence to be <br />constructed, as well as existing fence to be rehabilitated, on amended <br />Exhibit 3.1-1. The same BLM fencing specifications used for the recent <br />Munger Canyon reclamation project (or alternative specifications <br />acceptable to BLM) should be specified. <br />CAM: The Fence Layer in AutoCad was accidentally turned off on Figure 3.1-1, <br />please see the proposed fence depicted on attached Figure 3.1-1. Please see <br />revised page 3-16 detailing the location of the reclamation fencing, and <br />emphasizing the BLM specifications that it will adhere to. In Adequacy Review <br />No. 2, the operator may not have made it clear that they plan to relocate the drift <br />fence with new construction. As such, the existing fence is not shown on Figure <br />3.1-1 and has been removed from Figure 2.2-3 since it traverses through the <br />Construction Material Stockpile, and Topsoil stockpile. <br />Rule 2.05.6(1) Air Pollution Control Plan <br />50. DRMS: The Division requested the operator to update permit section 4.7-to <br />incorporate measures associated with TR-16 proposed activities and <br />demonstrate compliance with 2.05.6(1). In addition, submit any necessary new <br />air quality permits, permit modifications, or applications for such required permits <br />or modifications, for inclusion in Appendix E. The operator did update the <br />narrative section on page 4- 79 (Section heading revised to 2.05.6(1) Air <br />Pollution Control Plan). Operator response stated that a new Emission permit <br />had been applied for as part of TRA 6. However, the pertinent emission permit <br />application was not submitted, as required by 2.05.6(i)(a). Please submit a copy <br />of the Emission Permit application pertinent to TR-16 proposed activities, <br />for inclusion in Appendix E.