Laserfiche WebLink
Bowie No. 2 Mine C-1996-083 <br />Technical Revision 53 <br />PROJECT IDENTIFICATION <br />Date : 19-Sep-08 Permit C-1996-083 Site: Bowie No. 2 Mine <br />User: JR_S_ <br />Filename <br />: <br />( <br />3-260 <br />C <br />08 State : Colorado <br />County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety _ <br />_ _ <br />_ <br />_ <br />Permit Action: Technical Revision 53 <br /> <br />Task <br /> <br />261 jTask Description <br />I <br />Plug and Seal Borehole <br />HC-08-0 <br />1 ITASK HOURS <br /> <br />4.00 DIRECT COST <br /> <br />$_1,364 <br />- <br />262 _ <br />_ <br />Regrade Drill Pad _ 3.15 $653 <br />_ <br />263 _ <br />Regrade <br />Light-Use Road 7.37 __$1,529 <br />_ <br />264 _ <br />Replace Topsoil from Stockpile to Drill Pad 1.36 - $283 <br />_ <br />265 Replace Topsoil from Stockpile Light-Use Road 1.80 $373 <br />266 Reseed Drill Pad 0.68 $465 <br />267 Reseed Light-Use Road _ 0.90 $616_ <br />268 Remove Water Line in Hubbard Creek 16.00 $2,501 <br /> Direct Cost Total 35.26 $7,784 <br /> INDIRECT COSTS <br />( Overhead and Profit <br />_ i Liability Insurance (1.55% of Direct Costs) <br />Performance Bond (1.05% of Direct Costs) $121 <br />$82 <br /> Job Superintendent (at $41.25/hour) 17.63 $727 <br /> Profit (10.00% of Direct Costs) $778 <br /> <br /> <br />I Total Overhead and Profit $1,708 <br /> Contract Amount (Direct Costs + Overhead and Profit) $9,492 <br /> Legal - Engineering - Project Management Engineering Work and Contract/Bid Preparation (4.25% of Contract) ?- $403 <br /> _ <br />Reclamation Management and Administration (3.25% of Contract) -- _$308 <br /> I <br /> TOTAL BOND AMOUNT $10,204 <br />jrs Page 1 9/22/2008