My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-08_REVISION - M1973007SG
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973007
>
2008-09-08_REVISION - M1973007SG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:39:01 PM
Creation date
9/22/2008 12:53:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973007SG
IBM Index Class Name
REVISION
Doc Date
9/8/2008
Doc Name
Reclamation Cost Review
From
DRMS
To
SES
Type & Sequence
AM3
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />SCRAPER - nNLY WARK <br />Task # <br />Date <br />User <br />Agency or organization name : DRMS <br />002 State : Colorado <br />0811212008 County: E/ Paso <br />JLE Site : Daniels Sand Pit #2 <br />Permit or other job action :Ammendment to the application <br />Task description : West SB: Spreading Topsoil <br />:::...:..:..::.:..::..:.........................:::::::::::::.. . <br />HOURLY EQUIPMENT COST <br />Model : Cat 623G Shiftbasis : 1 per day <br />Cost Breakdown : Job utilization % Horsepower : 365 <br />Ownership cost/hour : $75.32 NA Weight (UST) : 40.92 <br />Operating cost/hour : $79.97 75 Cost data source : (CRG) <br />Operator cost/hour : $32.96 NA <br />Total unit cost/hour : $188.25 Total fleet cost/hour : $376.50 <br />::: ::::::......................... <br />MATERIAL ................................ <br />QUANTITIES <br />............................................................... <br />............................................................ <br />Initial Swell Loose <br />volume : 13,955 BCY factor : 1.429 volume : 19,936 LCY <br />Source of quantity take-off :Applicant <br />Source of estimated swell factor : Topsoil figure <br />, <br />xx <br />::::............................................................. <br />HOURLY PRODUCTION ............................................................... ............................................................... <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 1,600 pounds/LCY Struck volume : 18.00 LCY <br />Material description : Heaped volume : 23.00 LCY <br />Top Soil Average volume : 20.50 LCY <br />Rated payload : 55,000 pounds <br />Payload capacity: 34.38 LCY Adjusted capacity : 20.50 LCY *** <br />Cycle Time (load + haul + spread + return) : Loading time : 0.90 minutes <br /> Maneuver and spreading time : 0.70 minutes <br />Travel time : • loading time per pair on push-pull models <br />Route Distance (feet) Grade (%) Roil. res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul: 5,400 0.0 3.0 3.0 2,189 2.77 minutes** <br />Return 5,400 0.0 3.0 3.0 2,666 2.03 minutes" <br />•' travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance shown, not average Total cycle time 6.39 minutes <br />Job Condition Correction Factors : <br />Site altitude (feet) : 6,000 I Adjusted Hourly Production ; <br />Altitude adjustment factor : 1.00 (Cat HB) Unadjusted unit production : 192.45 LCY/Hour*** <br />Job efficiency factor : 0.83 (1 shift/day) Adjusted unit production : 159.73 LCY/Hour <br /> Adjusted fleet production : 319.47 LCY/Hour <br />Net job correction factor : 0.83 ••• 2 times volume on push-pull models <br />JOB TIME AND COST <br />Fleet size : 2 Scraper(s) Total job time : 62.40 Hours <br />Unit cost : $1.179 /LCY Total job cost : $23,495 <br />Permitijob #: M- 1973-007-SG <br />Abbreviation :none <br />Filename : M-SG-002
The URL can be used to link to this page
Your browser does not support the video tag.