Laserfiche WebLink
Agency or organization name : DRMS <br />Permit or other job action :Ammendment to the application <br />Task description : West SB: Dozer work <br />..................................................................................................................................................................................... <br />:.:::.:...................................................................................................................................................................................... <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat DBR Series 11- 8SU (200,1 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : BOPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $57.13 NA <br /> Operating cost/hour : $57.84 75 <br /> Ripper op. cost/hour : $0.67 10 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $148.42 Total fleet cost/hour : $296.84 <br />::....:......::: <br />MATERIAL QUANTITIES ::::::: :::::::::::::::::::::::.::::.:............ ................................ .................. <br />Initial Swell Loose <br />volume : 45,496 LCY factor : NA volume : 45,496 LCY <br /> <br />Source of estimated volume :Applicant <br />Source of estimated swell factor : NA <br />x "x: <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (a vg.) <br />Average push distance : 200 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 491.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted rill or embankment Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 1.02 (Cat HB) <br />Average push gradient : 1.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.85 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,700 Ibs/LCY Net correction : 0.39 <br />Weight description ; <br />Sand and clay - Loose <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) <br />Unit cost : $0.773 /LCY Total job cost : $35,168