Laserfiche WebLink
• 3. Mining Timetable <br />A detailed timetable of the operation at White River City Pit can be found in Exhibit E, Section 2. <br />4. Mine Facilities and Operation <br />The site will contain the following facilities, it is noted where applicable whether or not the facility is <br />portable and whether it will have any fuel storage associated with it. Table D-5 below shows a <br />summary of the tanks which will be present onsite as well as a summary of the secondary containment <br />used with each tank. <br />• A portable screening/washing plant with a 500 gallon diesel tank <br />• A portable Asphalt plant with a 25,000 gallon diesel tank <br />• A portable Concrete plant with a 500 gallon diesel tank <br />• Portable Scales <br />• • A portable office trailer <br />• A portable crusher with a 500 gallon diesel tank <br />• A portable crusher with a 2,000 gallon diesel tank <br />• Two fuel farm with a pair of 6,000 gallon diesel tank (double-walled) <br />• A portable QC lab trailer <br />• A small portable shop trailer <br />It is possible that other facilities may be present onsite in the future. In the event that Connell <br />Resources wishes to bring other facilities onsite for the operations, the Division of Reclamation, <br />Mining and Safety and Rio Blanco County will be contacted with a Technical Revision to allow for <br />these facilities to be onsite. All other necessary permits through State organizations will also be <br />obtained on a case by case basis as required for each facility. <br /> <br />White River City Pit, August 08 D-7