Laserfiche WebLink
• <br />Table D-2 Permit Acreage Breakdown <br />Permit Area Description Acreage <br />Undisturbed Area 6.16 <br />Access Roads 0.39 <br />Perimeter disturbance 4.63 <br />Phase 1 11.00 <br />Phase 2 10.90 <br />Phase 3 11.00 <br />Phase 4 10.60 <br />Phase 5 9.50 <br />Phase 6 9.50 <br />Phase 7 9.40 <br />Staging Area 9.66 <br />Total Permit Area 92.74 <br />Phases 2-7 can all be accessed from the existing disturbed area in Phase 1. <br />Mining will progress through the Phases numerically. A table of expected mining lives for each Phase <br />• is included in Table D-3. The life of each Phase is based on the anticipated annual average tonnage <br />(500,000 tons/yr). Any available topsoil and overburden from a new area will be used to reclaim the <br />• <br />previously mined areas. <br />White River City Pit, August 08 D-5