My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-11_REPORT - M1977129
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977129
>
2008-09-11_REPORT - M1977129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:19:52 AM
Creation date
9/12/2008 10:54:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977129
IBM Index Class Name
REPORT
Doc Date
9/11/2008
Doc Name
Annual Fee/Report/Map
From
Whitewater Building Materials Corporation
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permittee: WHITEWATER BUILDING MATERIALS CORP. PAGE 3 <br />Permit #: M-1977-129 <br />Operation Name: WHITEWATER 500 PIT <br />Anniversary Date: 09122108 <br />Weed control began this year on the area surrounding Stage 3 <br />- PART A. We sprayed Knapweed and White Top from June 15th <br />to June 27th with water soluble 2-4-D and Curtail'". Approx- <br />imately 1000 gallons of spray mix was use. <br />(3) Mining will continue in Stage 2 - PART A as we clean the <br />floor in the mined area and removed material from the par- <br />tially mined area west of the Plant Site. In Stage F the <br />mine face will continue to move to the east. If more area <br />is needed, we will resume stripping ahead of the mining face <br />in that Stage. Mining may resume in Stage 3 - part A if <br />more material is needed then what we have stored the in raw <br />material stockpile in Stage 6. Overburden will continue to <br />be stockpiled along the perimeter of the mined area. <br />(4) Bank sloping and grading will continue in Phase 2 - PART A <br />as needed (blue). We expect to have the Phase 2 - PART A <br />sloping complete during the 2008-2009 year. Some time in <br />late 2008 or early 2009 we will move processing to the north <br />area and begin final reclamation in Phase 2. At that time <br />dewatering will end and once the water level stabilizes <br />revegetation can begin. <br />(5) The current contact for this pit is: <br />Mr. Mark Gardner (970) 242-7538 <br />Whitewater Building Materials Corp. <br />940 South 10th Street <br />Grand Junction, CO 81502 <br />The annual report date is September 22, 2008 and the effec- <br />tive date of all information is August 22, 2008. This packet <br />contains the Annual Report Maps, and the Annual Fee check for <br />$791.00. <br />Respectfully Submitted, <br />Whitewater Building Materials Corp. <br />Edward Gardner <br />vice President <br />cc Whitewater Building Materials Corp. <br />file <br />F:\WW500\500.08
The URL can be used to link to this page
Your browser does not support the video tag.