Laserfiche WebLink
2 <br />At peak flows of approximately 40,000 cfs in June of 2008, water would have entered the <br />west end of the pit at point 497 & 498 (River Station 1.7) if the dike had not been <br />constructed in this area. <br />With the completion of the dike along Phase II, the pit will be protected from the 100- <br />year flood event. <br />Enclosed is a check in the amount of $216.00 for the Technical Revision fee. <br />Thank you for consideration in this matter. <br />Sincerely, <br />Edward J S le, P.E.