PERMIT FILE - 9/3/2008, 9:13:34 AM-MR1
DRMS
>
Public
>
PERMIT FILE - 9/3/2008, 9:13:34 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:43 PM
Creation date
9/3/2008 10:54:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
PERMIT FILE
Doc Date
8/12/2008
Doc Name
Needed items for NOI
From
Powertech (USA) Inc.
To
DRMS
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP No. 5.0 Monitoring Well Install <br />4.0 EQUIPMENT LIST <br />Equipment that will be used for installing groundwater monitoring wells includes (as per <br />American Society for Testing and Materials [ASTM] 1996, U.S. Environmental Protection <br />Agency [EPA] 1986, 1990): <br />• Well casing and well screen <br />• Bentonite pellets for the annular seal <br />• Filter pack sand [Field Determined] <br />• Cement and powdered bentonite for grouting <br />• Stainless-steel centralizers <br />• Protective steel well casing with locking cap <br />• Steel guard posts <br />• Decontamination equipment and supplies (See SOP 10.0, Decontamination of Sampling <br />Equipment) <br />• Well location map <br />• Drill rig capable of installing wells to the desired depth in the expected formation materials <br />and conditions (i.e., capable of hanging well casing, tremie pumping sand and grout, and <br />accurate measurement of material in the annulus). (See SOP 37.0, Drilling and Sampling of <br />Subsurface Materials.) <br />• Weighted tape measure <br />• Water level probe <br />• Disposable latex gloves <br />• Appropriate health and safety equipment <br />• Waterproof pens <br />• Weatherproof bound field logbook <br />• Powertech Database forms <br />• Calculator <br />• Well Completion Diagram (Figure 1). <br />• GPS, set to correct coordinate system <br />5.0 GROUNDWATER MONITORING WELL INSTALLATION <br />PROCEDURES <br />Well construction procedures will fulfill all applicable regulatory agency requirements for permit <br />applications, material standards, and construction/completion protocols. Licensing and/or <br />certification of the driller may be required. In order to maintain quality control and obtain <br />7/28/08 <br />Page 2of10 <br />R Squared Inc.