My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 9/3/2008, 9:13:34 AM-MR1
DRMS
>
Public
>
PERMIT FILE - 9/3/2008, 9:13:34 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:43 PM
Creation date
9/3/2008 10:54:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
PERMIT FILE
Doc Date
8/12/2008
Doc Name
Needed items for NOI
From
Powertech (USA) Inc.
To
DRMS
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP No. 5.0 Monitoring Well Install <br />STANDARD OPERATING PROCEDURE No. 5.0 <br />MONITORING WELL INSTALLATION <br />1.0 PURPOSE AND SCOPE <br />The purpose of this document is to define the Standard Operating Procedure (SOP) for installing <br />groundwater monitoring wells in unconsolidated geologic materials and bedrock at the <br />Powertech, Inc. (hereafter referred to as Powertech) Mine Site and in surrounding areas. This <br />SOP describes designs, procedures, and materials used to construct monitoring wells that will <br />produce accurate groundwater level measurements and representative groundwater samples. Well <br />construction and abandonment reports will be submitted to the Colorado State Engineer. The <br />step-by-step procedures described herein are intended to be sufficiently detailed to allow field <br />personnel to properly install monitoring wells. <br />2.0 RESPONSIBILITIES AND QUALIFICATIONS <br />The Project manager has the overall responsibility for implementing this SOP. He/she will be <br />responsible for assigning appropriate environmental staff to implement this SOP and for ensuring <br />that the procedures are followed accurately by all personnel. <br />All personnel performing these procedures are required to have the appropriate health and safety <br />training. In addition, all personnel are required to have a complete understanding of the <br />procedures described within this SOP and receive specific training regarding these procedures, if <br />necessary. <br />All project staff are responsible for reporting deviations from this SOP to the Project Manager. <br />3.0 RELATED STANDARD OPERATING PROCEDURES <br />The procedure for monitoring well installation set forth in this SOP is intended for use with the <br />following SOPS: <br />SOP 3.0 Borehole Logging <br />SOP 6.0 Water Elevation Measurements <br />SOP 10.0 Decontamination of Sampling Equipment <br />SOP 11.0 Sample Management <br />SOP 15.0 Well Development <br />SOP 22.0 Groundwater Sampling <br />SOP 35.0 Surveying (Land and GPS) <br />7/28/08 Page 1 of 10 R Squared Inc.
The URL can be used to link to this page
Your browser does not support the video tag.