Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID M-198A-OAI <br />INSPECTION DATE: ---811.5.408 INSPECTOR, S INITIALS: KAP <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />_Durinq the inspection, it was discovered that there were no boundary markers identifying 9 /15 /08 <br />the permit boundary at the site This is a problem related to Section 3 1 12 (2) of the <br />Construction Materials Rules and Regulations for failure to mark the boundaries of the <br />nffPCted nrPn by mnni imantc or nthar mnrkPrc thnt nra dPnrly vicihla nnrl nrjPgi into to <br />delineate such boundaries. <br />PB or PV: _P_B_ <br />TOPIC(S): SU <br />Corrective Action: Place appropriate boundary markers at the site within 30 days of receipt <br />of this inspection report, and send photos to DMG for verification.