My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1982056 (59)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
_INSPECTION - C1982056 (59)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2020 10:15:50 AM
Creation date
9/2/2008 2:28:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
8/27/2008
Email Name
JHB
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS- COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made during <br /> the inspection. Comments also describe any enforcement actions taken during the inspection and the <br /> facts or evidence supporting the enforcement action. <br /> Clean out of ditch intersection and 24" CMP at corner of Ditch D-1 and Clean coal pile perimeter ditch <br /> is needed. <br /> TCC continues to install piping and valves to the 6MN million Gallon Tank. The ditch is still open and <br /> the piping continues to be installed. Grading of the finished buried line continues and seeding will <br /> follow during the appropriate seeding window. <br /> 1 ORT borehole pad. New borehole has just been completed this week. Drillers had difficulties and <br /> water was apparent flowing down the south face of the pad and into the SAE. The Ditch and rock check <br /> dam proved effective in managing the sediment off this pad. No drilling mud was observed downslope <br /> of the rock check dam. The SAE ditch on the south side of the pad needs additional cleanout. Drilling <br /> mud and material needs to be cleaned off the 1 ORT pad around the new hole. The 1 ORT topsoil pile <br /> needs shaping and seeding this fall. <br /> Processing Waste: No coal is currently being extracted. Raw coal pile is very depleted. Coal was not <br /> actively processing through Wash Plant II. A small amount of coal was processing through Wash Plant I <br /> and loading at the Stoker area. Due to Wash Plant II not processing, no waste material was being hauled <br /> to the refuse pile during the inspection. <br /> 5 of 6 WHITE- File YELLOW-Operator PINK-Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.