Laserfiche WebLink
<br />...._...._...... __ ............ ..,.._....... _._ ......_.............. ,..............._ ............_.._ ..,....._...._.._. ..........................._ ._............................... <br /> ..... .: <br />sheet 2 of 2 <br />RnAnARI F 9=n111PM . FNT <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 2, 500 Gal. $45.01 1 $45.01 $45.01 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $45.01 $45.01 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Parker <br />Transportation Cycle Time : Non- Total one-way travel distance : 10.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.29 0.29 Total non-roadable mob/demob cost' : $3,447.41 <br />Return time (hours) = 0.29 0.29 * two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost ** : $25.72 <br />Unloading time (hours) = 1.00 NA ?• one round trip, no haul rig <br />Subtotals = 2.57 0.57 <br /> <br /> <br />.............................................................. <br />JOB TIME AND COST <br />.......................... <br />................................. <br />.............................................................................................. <br />Total job time : xxx <br />......... <br />5.14 hours <br /> Total job cost : $3,473