Laserfiche WebLink
?e <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name : DBMS <br />Task #: 005 State : Colorado Permit/job #: M-1977-252 <br />Date : 0711112008 County:Douglas Abbreviation :none <br />User : DB2 Site: Pioneer Mine Filename :M252-005 <br />Permit or other job action : So <br />Task description : MObe / Demobe <br /> <br /> <br />EQUIPMENT TRANSPORT RIG COST :.::::.... <br />Shift basis: :::::::::: :::.:................................... <br />1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour:, $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series 11 - 8SU (20 52.55 $50.32 $125.45 1 $175.77 $125.45 $0.00 <br />-Cat 627G 40.90 $55.31 $117.55 3 $518.59 $352.65 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $694.36 $478.10 $0.00 <br />sheet 1 of 2