2008-08-22_INSPECTION - M1978014
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1978014
>
2008-08-22_INSPECTION - M1978014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:42 PM
Creation date
8/25/2008 8:52:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978014
IBM Index Class Name
INSPECTION
Doc Date
8/22/2008
Doc Name
Insp Rpt
From
DRMS
To
Robinson Brick Company
Inspection Date
7/10/2008
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />HOURLY PRODUCTION sheet 2 of 2 <br />Haulinq Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 1,600 pounds/LCY Struck volume : 15.70 LCY <br />Material description . Heaped volume : 21.00 LCY <br />Top Soil Average volume : 18 35 LCY <br />Rated payload : 48.000 pounds Adjusted capacity : 18.35 LCY <br />Payload capacity : 30.00 LCY hourly production reflects volume per scr aper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) 6,100 <br /> Scraper Push dozer Source <br />Scraper loading time 1.50 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0 830 NA (Cat HB) <br />load time per scraper pair on push-pull models Net correction . 0.830 NA <br />Travel time <br />Road condition description : Hard, smooth, stabilized. surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll res. (%) Total res. (%) Velocity (fpm) T ravel time (min.)" <br />1 1,400 0.00 2.00 2.00 2868 0.65 <br />I <br />Return route : <br />Haul time : 0.65 minutes <br />1 1,400 0.00 2.00 2.00 2905 <br /> <br />travel time for each segment is adjusted for acceleration/deceleration Return time : 0.59 <br />table velocities are max attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.34 <br />Unadjusted unit production/hour : 329.55 LCY/hour Adjusted for job conditions : 273.53 <br />Optimal number of scrapers per push dozer NA Selected number of scrapers : 1 <br />Adjusted single scraper team (unit) hourly production : 273.53 <br />Adjusted multiple scraper team (fleet) hourly production : 820.55 <br />JOB TIME AND COST <br />Fleet size 3 Team(s) <br />Unit cost : $1.000 /LCY <br />minutes <br />minutes <br />LCY/hour <br />scraper(s) <br />LCY/hour <br />LCY/hour <br />Total job time : 42.65 Hours <br />Total job cost : $34,984