Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />Agency or organization name : DRMS <br />Task #: 002 State :Colorado <br />Date : 0711112008 County :Jefferson <br />User : DB2 Site : Chieftain North <br />Permit or other job action : So <br />Task description : Spread Topsoil <br /> <br />Equipment Description <br />Scraper work team -Scraper : Cat 627G <br />-Push dozer:NA <br />)ad maintenance -Motor grader : NA <br />-Water truck : Water Tanker, 2.500 Gal. <br />Support equipment -Load area :NA <br />-Dump area : Ca. <br />Cost Breakdown : Scraper Work Team Support Equipment Road Maintenance Equipment <br /> Scraper Dozer Load area Dump area Grader Water truck <br />Import data filename scraper2 NA NA dozer NA misctruk <br />% Utilization-machine : 100 NA NA 100 NA 35 <br />-Ripper attachment NA NA NA 50 NA NA <br />Ownerhip cost/hour $5531 NA NA $41.70 NA $7.53 <br />Operating cost/hour $125.95 NA NA $56.19 j NA $5.40 <br />Ripper op. cost/hour NA NA NA $0.00 NA $0.00 <br />Operator cost/hour : <br />I $32.96 NA NA $32.78 NA $33.94 <br />Unit subtotals $214.22 NA NA $130.67 NA $4687 <br />Number of units :1 3 0 0 1 0 1 <br />Group subtotals : Work : $642.67 Support $130.67 Maintenance : $46.87 <br /> <br /> Total work team cost/hour $820.22 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 35,000 LCY factor : NA volume : 35,000 LCY <br />Source of quantity take-off : visual estimate <br />Source of estimated swell factor : NA <br />Permit/job # M-1978-014 <br />Abbreviation . none <br />Filename : M014-002 <br />Shift basis : 1 per day <br />sheet 1 of 2 <br /> <br />DS Series It - 7SU