Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Health and Safety Management System <br />VLF Standard Operating Procedure <br />• Call the list of individuals below. <br />Pad Crew Supervisor H-7 Channel #3 <br />Process Ops Supervisor H-2 Channel #3 <br />VLF Coordinator H-9 Channel #3 <br />Process Superintendent H-1 Channel #3 <br />Mine Operations Foreman M-2 Channel #1 <br />Sr. Env. Coordinator E-2 Channel #3 <br />• Fill Out incident report. <br />12.0 Previously leached area to be dumped over must have a minimum of a single continuous ripping pass. If a <br />single pass cannot achieve a full shank, then a second pass is required. <br />13.0 Roads, and freshly dumped lifts to be leached, require two complete/full shank ripping passes. <br />Revision History <br />Revision <br />Number Date of <br />Revision By Whom Review <br />bate Summary of Revision <br />01 Jul 23, 2008 L Snyder Jul 2009 Initial release of Document <br /> <br /> <br />CC&V VLF Standard Operating Procedure Page 2 of 2 July 23, 2008 <br />Doc #: H&S 005-41 Printed copies are uncontrolled Revision 1