Laserfiche WebLink
A dbl R Well Service, Inc. <br />Allen Robbins- President <br />25269 WCR 50 <br />Kersey, CO 80644 <br />Ph: 970-284-0255 <br />QUOTATION <br />Date: August 1.3.2008 Job Description: Drilling Well <br />Name: Jim Taylor Expires: October 11, 2008 <br />Address: 665 Balsam Ave. City, State, Zip: Greeley. CO 80631 <br />QTY <br />, DESCRIPTION UNIT PRICE TOTAL <br />1 Mobilization & De-mobilization & set up fee 1,500.00 <br />60' Drilling 1,170.00 <br />20' 6 5/8 Steel Casing $14.96 385.00 <br />1 6 Steel to 5" PVC Adp 39.60 <br />20' Cement Job min. required 275.00 <br />40' S" PVC Plain Casing 5.89 235.60 <br />20' 5" PVC Perforated Casing 7.76 155.20 <br />1 5" PVC Bottom Cap 22.62 <br />40 - #8 Gravel 250.00 <br />1 6 5/8 Well Seal 56.27 <br />4hr Development 800.00 <br /> Any additional Development needed will be billed @ 150.00 hr <br /> Fuel Surcharge 320.40 <br /> Subtotal 5209.29 _ <br /> Tax 41.15 <br /> Freight <br /> Total 5250.44 <br />Please note this is a quotation, quantity and materials may vary due to unforeseen circumstances. <br />Additional cost will be billed at above listed prices; if additional materials are not listed it will be billed at cost for <br />quantities used. <br />I understand that 501/o of estimated total is expected down before work commences, and balance due upon completion. <br />Upon signing I accept this quotation and its'terms and conditions. <br />Signature and Title <br />Date