Laserfiche WebLink
Permit Revision No. 14, E 2 through E 12 Panels, E Seam Methane Drainage Wells (MDWs) <br />Project Plan, Federal Lease C-1362 and COC-67232. <br />Exhibits: Inclusion of the FEIS for the Deer Creek Shaft and E Seam Methane Drainage <br />Wells Project as Exhibit 79. <br />MCCs previous experience reclaiming these areas costs are $15,000 per pad including plugging <br />and abandonment of the wells and $30,000 per mile of roadway. Based on 131 pads and 10.02 <br />miles of roadway, MCC believes the reclamation cost for the drilling of E 2 through E 12 Panels <br />would be approximately $2,265,600. These costs, however, will be reviewed and updated as <br />necessary through the USFS Annual Operating Plans. <br />The CDRMS form for permit application and the public notice are attached to this letter of <br />transmittal <br />We appreciate your consideration and careful review of this submittal and, as always, would be <br />happy to work with you to address any questions or concerns that arise during the review process. <br />Aic?l y, <br />?, 44- <br />nry e71 arbe <br />Enviromnental Engineer <br />48 cc: Pete Wyckoff <br />Doug Nolte <br />Chris Hansen <br />CDRMSTransmittal LetterPR I4081808.doc