My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-15_PERMIT FILE - M2008050
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008050
>
2008-08-15_PERMIT FILE - M2008050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:32 PM
Creation date
8/18/2008 11:24:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008050
IBM Index Class Name
PERMIT FILE
Doc Date
8/15/2008
Doc Name
Final reclamation liability estimate
From
DRMS
To
Nuvemco, LLC
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name: DRMS <br />Permit or job action :Final Reclamation Liability Estimate-Alternative B <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a -removal and disposal of silt fencing demolish 1 3.0 _ $1,109 <br />_ <br />02a -rip 0.46 acres of footprint and compacted areas ripper 1 0.8 _ $120 <br />03a -push topsoil salvaged over 0.11 acres dozer 1 0.24 $32 <br />04a -transport alternative soils to site truck1 5 9.1 $3,688 <br />04b -spread alternative soils over 0.46 acres dozer 1 1.8 $238 <br />_ <br />05a -reveg of 0.46 acres revege 1 8.0 $802 <br />06a -initial mobilization to site mobilize 9 8.0 $3,990 <br />07a -secondary reclamation mobilization (seeding, weed control, erosion) mobilize 2 6.8 $735 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 37.5 $10,714 <br />* includes inflation factor adjustment of : NA % TOTAL DIRECT COST * =L $10,714 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance., 2.02 % of direct total = $216 <br />Performance bond : 1.05 % of direct total = $112 <br />Job superintendent : NA* NA NA total = NA <br />Profit : 10.00 % of direct. total = $1,071 <br />* not required (or eqp. operator serves as super.) TOTAL O & P = $1,400 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $12,114 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $_5_00 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $606 <br />CONTINGENCY - NA* NA total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST = $2,506 <br />TOTAL BOND AMOUNT (direct + indirect) _ $13,220
The URL can be used to link to this page
Your browser does not support the video tag.