My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-07_PERMIT FILE - M2008043
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008043
>
2008-08-07_PERMIT FILE - M2008043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:17 PM
Creation date
8/15/2008 8:25:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008043
IBM Index Class Name
PERMIT FILE
Doc Date
8/7/2008
Doc Name
Adequacy review response
From
Greg Lewicki & Associates
To
DRMS
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aug 07 08 03:50p Greg Lewicki and Associat <br />LIST OF OTHER PERMITS AND <br />LICENSES REQUIRED <br />The following permits are needed for the site: <br />3033466934 p.6 <br />EXBIBIT F <br />1) County Special Use - A full Special Use Permit is needed with the County Planning and <br />County Commissioner's office. The operator will be submitting a new application for this permit <br />concurrently with the DRMS amendment application. <br />2) APEN - A fugitive air emissions permit may not be needed for this site because the annual <br />production will be less than 70,000 tons per year. An APEN will be submitted and CDPHE will <br />decide if a permit is necessary. Air emissions permits will be in place for all portable equipment <br />utilized on site which requires a permit. <br />3) A Montrose County Access Permit will be required for vehicles entering Highway 90. <br />4) A Spill Prevention Control and Countermeasure (SPCC) Plan is needed for the Pinion Ridge <br />Pit mining operation. No spilled material will be allowed to leave the site and all tanks will have <br />secondary containment. In addition, the portable crusher and asphalt plant that will be on site <br />from time to time each have their own separate SPCC Plans. <br />5) No USCOE 404 permit will be necessary because no wetlands or waters of the U.S. will be <br />disturbed. <br />Pinion Ridge Pit. June 2008 F-1
The URL can be used to link to this page
Your browser does not support the video tag.