Laserfiche WebLink
Aug 07 08 03:50p Greg Lewicki and Associat <br />LIST OF OTHER PERMITS AND <br />LICENSES REQUIRED <br />The following permits are needed for the site: <br />3033466934 p.6 <br />EXBIBIT F <br />1) County Special Use - A full Special Use Permit is needed with the County Planning and <br />County Commissioner's office. The operator will be submitting a new application for this permit <br />concurrently with the DRMS amendment application. <br />2) APEN - A fugitive air emissions permit may not be needed for this site because the annual <br />production will be less than 70,000 tons per year. An APEN will be submitted and CDPHE will <br />decide if a permit is necessary. Air emissions permits will be in place for all portable equipment <br />utilized on site which requires a permit. <br />3) A Montrose County Access Permit will be required for vehicles entering Highway 90. <br />4) A Spill Prevention Control and Countermeasure (SPCC) Plan is needed for the Pinion Ridge <br />Pit mining operation. No spilled material will be allowed to leave the site and all tanks will have <br />secondary containment. In addition, the portable crusher and asphalt plant that will be on site <br />from time to time each have their own separate SPCC Plans. <br />5) No USCOE 404 permit will be necessary because no wetlands or waters of the U.S. will be <br />disturbed. <br />Pinion Ridge Pit. June 2008 F-1