Laserfiche WebLink
CIRCES Cost EstimatinaSoftware <br />DEMOLITION WORK <br />PROJECT IDENTIFICATION Agency or organization name : Division Of Reclamation, Mining And Sat* <br />Task #: 65a State : Colorado Pennitrjob# : C1982-056 <br />Date : 11-Aug-2008 County : Routt Abbreviation : none <br />User : JHB Site : Foidel Creek Mine Filename : C056-65a <br />Permitting action : TR65 <br />Task description : demolish Stoker load out additions <br />:::' :::.......................................................................................................... ...... .. <br />UNIT COSTS Last unit cost update : May, 2007 Location adjustment : 92.32% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br /> <br />-1) Stoker Coal Feed Conveyor (WP 11) 50 R. long elevated Conveyor, elevated- 5' W x W H 50.00 LF $37.8300 $1,891.50 <br />-2) stoker coal transfer conveyor 190' L elevated Conveyor, elevated - 5' W x W H 190.00 LF $37.8300 $7,187.70 <br />-3) Stoker conveyor 20' ext. 20 R. L extension Conveyor, elevated - 5' W x W H 20.00 LF $37.8300 $756.60 <br />-4) WPII Stoker Conveyor Bents 3 bents 65 to 40 R high Demo./disp./existing pit - 200' push 7,560.00 CF $0.1935 $1,463.07 <br />Exh. 1A p. 40 describes bent dimensions <br />-5) Concrete pad at Stoker Truck L- 0. 15W x 100 Demo./disp. exs. pd, 12'th.-fOK R. 55.56 SF $3.4143 $189.70 <br />-6) 3 conveyor bent looters 3(16 It) Demo./disp. exs. pit, 1.55x3'-200 R. 48.00 LF $15.2503 $732.02 <br />-7) remove 6 caissons to below grade 6(3'dia. x 4' high) Demo.1disp. exs. pit, 2x3' - 200 W. 28.00 LF $20.3338 $569.35 <br />JOB COST Subtotal (unadjusted): $12,790 Total Cost (adjusted for location): $11,808