My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-12_REVISION - M1973007SG
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973007
>
2008-08-12_REVISION - M1973007SG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:39:01 PM
Creation date
8/14/2008 11:31:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973007SG
IBM Index Class Name
REVISION
Doc Date
8/12/2008
Doc Name
2nd Adequacy Review
From
DRMS
To
SES
Type & Sequence
AM3
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pit slopes above the Fountain Mutual Ditch if the highway construction is <br />delayed. There are no additional concerns with this item. <br />Item C.- Growth Medium <br />Using material generated outside of the permit area to enhance the soil <br />characteristics to help establish vegetation is a good idea. The Division does not <br />want to limit the operator from doing so, but in accordance with Rule 3.1.5 (9) the <br />operator must submit a Notice to the Office if structural fill generated out side of <br />the mine area is to be used to backfill the mine site. Prior to utilizing outside <br />material the operator must commit to submitting the required Notice as described <br />in the above referenced rule. <br />Exhibit S - Permanent Man-Made Structures <br />Thank you for submitting this material, unfortunately, the damage agreement <br />between Continental Materials Corporation and Johnson Family Trust must be <br />notarized to be in compliance with Rule 6.4.19. Please submit a notarized <br />damage agreement. <br />Further items of concern regarding the application: <br />Exhibit L - Reclamation Costs <br />The Division has almost completed the review of this section; however some <br />additional information is needed to complete this review. <br />For the "Slope Reconstruction By Backfilling" section, What is the source of the <br />material that will be used to backfill these slopes? Is this material stockpiled? If <br />so where is the stockpile located? To calculate this part of the cost, the Division <br />will need to know the average distance this material will be hauled so it can be <br />used to backfill the slopes. If this material is stockpiled, please submit a new <br />mine plan map that displays the location of this material. <br />This concludes the Division's second adequacy review for this amendment application. <br />Please remember that the decision date for this application is August 30`h, 2008. If you <br />need more time to address these issues, please request an extension of the decision date. <br />If you have any questions please call me at (303)-866-4922
The URL can be used to link to this page
Your browser does not support the video tag.