My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-04_PERMIT FILE - M2008009
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008009
>
2008-08-04_PERMIT FILE - M2008009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:11 PM
Creation date
8/12/2008 2:56:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008009
IBM Index Class Name
PERMIT FILE
Doc Date
8/4/2008
Doc Name
Final reclamation cost estimate
From
DRMS
To
3B Enterprises, LLC
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kDJUSTED COSTS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel <br /> <br />Lube <br /> <br />Tires sheet 2 of 2 <br /> <br />G.E.C. <br />Acquisition cost : $12.68 NA NA NA NA NA NA NA NA NA NA <br />Economic life -Grader and ROPS : $12.68 NA NA $3.62 $7.91 $3.02 $7.67 NA NA NA NA <br />-Attachment no. 2 <br />: NA NA NA $0.04 $0.66 $0.80 $0.97 NA NA NA NA <br />- <br />Annual usage : $19.13 $11.00 $13.08 NA NA NA NA NA NA NA NA <br />Double shifts : $14.34 $5.50 $6.54 NA NA NA NA NA NA NA NA <br />Triple shifts : $12.76 $3.66 $4.36 NA NA NA NA NA NA NA NA <br />Mechanic labor-Grader and ROPS : NA NA NA $2.12 NA $1.77 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.02 NA $0.47 NA NA NA NA NA <br />Fuel/lube -Grader and ROPS : NA NA NA NA NA NA NA $18.94 $4.58 $4.88 $0.64 <br />Attachment no. 2 : NA NA NA NA NA NA NA $0.00 $0.18 $0.00 $0781 <br /> <br />4DJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel <br /> <br />Lube <br /> <br />Tires <br /> <br />G.E.C. <br />3rader, ROPS and Attachment no. 2: <br />Motor Grader and ROPS <br />Single shifts : $19.13 $11.00 $13.08 $2.12 $7.91 $1.77 $7.67 $18.94 $4.58 $4.88 $0.64 <br />Double shifts : $14.34 $5.50 $6.54 ttachment no. 2 : <br />Triple shifts : $12.76 $3.66 $4.36 $0.02 $0.66 $0.47 $0.97 $0.00 $0.18 $0.00 $0.81 <br /> <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 9.80% ($/hr) Shift Differential Colorado labor zone : 2 <br />Grader - rough blade $16.39 $4.20 $1.25 $1.02 $1.61 $24.47 Day : $0.00 Two shift per day average : $0.15 <br />Grader - finish blade $16.39 $4.20 $1.25 $1.02 $1.61 $24.47 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $16.74 $4.20 $1.28 $1.04 $1.64 $24.90 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operatin g and Overhaul Operator Total <br /> Machine Attachments Cost/hr ($) <br />Single shifts : $43.20 $48.51 $3.11 $24.47 $119.29 <br />Double shifts : $26.38 $48.51 $3.11 $24.62 $102.62 <br />Triple shifts : $20.77 $48.51 $3.11 $24.72 $97.11 <br />EQUIPMENT PERFORMANCE DATA <br />Description Horsepower <br />(FHP) Transmission <br />type Weight <br />(UST) Length <br />(ft) Width <br />(ft) Height <br />(ft)" Fuel <br />type Min. turning <br />circle (ft) Ripper <br />type <br />Motor grader : CAT 14H 215 NA 20.7 35.0 9.2 10.9 Diesel 51.84 NA <br />Attachment no. 1 : Moldboard (blade) NA NA NA NA 14.0 2.2 NA NA NA <br />Attachment no. 2 : Multi-shank ripper NA NA 1.9 NA 8.5 1.3 NA NA Parallelogram <br />Total weight :1 22.6 (UST) for ripper, maximum ripping depth <br />Ground speeds (mph) at rated engine RPM <br />Transmission Gear: 1st 2nd 3rd 4th 5th 6th 7th 8th <br />forward : 2.3 3.3 4.4 6.4 9.6 13.5 18.3 26.5 <br />reverse : 2.6 3.6 4.9 7.1 10.7 15.0 20.3 29.4
The URL can be used to link to this page
Your browser does not support the video tag.