Laserfiche WebLink
Agency or organization name : DRMS <br />Permit or other job action :AM-01 Bond <br />Task description : Settling Pond - Replace Topsoil <br />HOURLY:EUIPM:.;::.;:.;... .............................................. <br />Q ENT COST <br />Basic machine : Cat D8R Series 11- 8SU (200; Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $50.32 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $160.22 Total fleet cost/hour : $160.22 <br />MATERIAL :::::.................................... <br /> <br /> <br />QUA. . <br />: . .NTITIES ........................................................ ................................................. .............. ..... ................................ <br /> <br />............... <br />. <br />.......................... <br />Initial Swell Loose <br />volume : 3,230 L CY factor : NA volume : 3,230 LCY <br /> <br />Source of estimated volume: RMC <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 300 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 291.4 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.45 <br />Weight description <br />Earth - Drv hacked <br />Adjusted unit production : 130.84 LCY/hr <br />Adjusted fleet production : 130.84 LCY/hr