My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-11_REVISION - M1997058
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997058
>
2008-08-11_REVISION - M1997058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:01:40 PM
Creation date
8/11/2008 3:02:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997058
IBM Index Class Name
REVISION
Doc Date
8/11/2008
Doc Name
Adequacy review
From
DRMS
To
Civil Resources
Type & Sequence
AM2
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : DRMS <br />Permit or other job action :AM-01 Bond <br />Task description : Settling Pond - Replace Overburden <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series /l - 8SU (200,1 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $50.32 NA <br />Operating cost/hour : $77.13 100 <br />Ripper op. cost/hour : <br />- $0.00 <br />-- NA <br />Operator cost/hour: i32-78 NA <br />Total unit cost/hour : $160.22 Total fleet cost/hour : $160.22 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,460 LCY factor : NA volume : 6,460 LCY <br />Source of estimated volume: RMC <br />Source of estimated swell factor : NA <br />;. <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br /> <br />Source <br />Average push distance : 300 feet <br />Unadjusted hourly production : 291.4 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />0.00 % (pos) <br />5,000 feet <br />Material weight <br />Weight description <br />Earth - Drv hacked <br />Z550 Ibs/LCY <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (lshiit/day) <br />Spoil pile : 0.80 (ind-rt) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction :- 0.45 <br />Adjusted unit production <br />Adjusted fleet production <br />130.84 <br />LCY/hr <br />LCY/hr <br />130.84 <br />_ ................ ............ - ...... .::::......:::::::......:: <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 49.37 Hours <br />Unit cost : $1.225 /LCY Total job cost : $7,910
The URL can be used to link to this page
Your browser does not support the video tag.