My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-05_GENERAL DOCUMENTS - C1981013
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981013
>
2008-08-05_GENERAL DOCUMENTS - C1981013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:12 PM
Creation date
8/11/2008 2:50:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
General Documents
Doc Date
8/5/2008
Doc Name
Faxed Drill Hole or Well Abandonment Report
From
Peak Project Management, LLC
To
DRMS
Permit Index Doc Type
Exploration
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRlUL ! : FAX NO. : 17190464975 Aug. 05 2009 02:35PM P1 <br />Peak Project Management, LLC <br />34115 County Road 20.8 Trinidad, CC 81082 <br />i 1 <br />Telephone- (719) 646.4975 Fax: (719) 84649 <br />r outhoMpson@wildblue.net <br />August 5, 2008 <br />Mr. Kent Gorham <br />Division of Reclamation. Mining and Safety <br />1313 Sherman. Street, Room 215 <br />Denver, CO 90203 <br />Re: Golden Eagle Mine Permit No. C-81-013 <br />Phase HI Release <br />Well Abandonment Reports <br />Dear Mr. Gorham: <br />Attached are well abandonment reports for wells GE-77, ACAW-1, PAW-5, <br />PAW-6 and CLAW-1. Well GE-77 was drilled in July of 1995 and completed <br />as a water monitoring well. in 1996, with the closure of the Golden Eagle Mine, <br />well abandonment was completed by Pike's Peak Geological Services under the <br />direction of Ronald Thompson. The well casing was cut-off` five feet below <br />ground level and filled with a Portland cement mix. The well was completed to <br />1122 feet. No records of water intervals are presently available. The well was <br />permitted by MR-65. In 1997 it was transferred from the Golden Eagle mine <br />permit reclamation bond to the bond submitted with NOI number CX-93-213-- <br />03. <br />Wells PAW-5 and PAW-6 Twere alluvial hey monitoring wells <br />through the alluvium and <br />'Waste, Water and Land. Y were auger d bedrock. The wells were <br />terminated at the intercept with the underlying <br />completed with 411. perforated steel casing. (Details are in Exhibit 6 of the above <br />referenced mining permit)_ The steel casing was extracted from the wells in <br />2007 and the annulus filled with a Portland cement mix.
The URL can be used to link to this page
Your browser does not support the video tag.