Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatinta Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task # : 052 State :Colorado PermitrJob #: C-1982-057 <br />Date : 08/05!2008 County:Routt Abbreviation :none <br />User : JRS Site : Seneca li-W Filename : C057-052 <br />Permit or other job action : 2008 Midterm Review <br />Task description : Replace Topsoil from Stockpile J to Final Pit Area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />acraper worK team -scraper <br />-Push dozer <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader ;CAT 14H <br />-Water truck ;Water Tanker, 10,000 Gal. <br />Cost Breakdown : Scraper Work Team <br /> Scraper Dozer <br />Import data filename : scraper2 NA <br />% Utilization-machine 100 1 NA <br />-Ripper attachment NA NA <br />Ownerhip cost/hour :j $110.37 NA <br />Operating cost/hour: 8177 86 NA <br />Ripper op. cost/hour : NA NA <br />Operator costihour :j $24.95 NA <br />Unit subtotals :1 $313.18 NA <br />Number of units l 4 0 <br />Group subtotals :l Work : $1,252.71 <br />Support Equipment <br />Load area Dump area <br />NA NA <br />NA NA <br />NA NA <br />NA NA <br />NA _ 1....__ - NA-- - <br />NA NA <br />NA NA <br />NA <br />- NA <br />---------- -- <br />0 - <br />0 <br />Support: $0.00 <br />Total work team costlhour <br />Road Maintenance Equipment <br />-Grader Water truck <br />grader I misctruk <br />25 25 <br />0 <br />- NA <br />- --------- <br />$39,60 --- -- <br />i $55.60 <br />$12.13 $22.21 <br />$0.00 $0.00 <br />$24.47 $33.94 <br />$76.20 <br />.. <br />.. ... $111.95 <br />.. _. <br />. <br />1 i 1 <br />Maintenance : $188.15 <br />$1,44a85 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 82,227 LCY factor : NA volume : 82,227 LCY <br />637G w/push pull <br />Source of quantity take-off : Table 21-3 <br />Source of estimated swell factor : NA