My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-06_REVISION - C1982057
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2008-08-06_REVISION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:15 PM
Creation date
8/11/2008 9:34:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
REVISION
Doc Date
8/6/2008
Doc Name
Midterm Review Reclamation Cost Estimate
From
DRMS
To
Seneca Coal Company
Type & Sequence
MT5
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />-------------- <br />Material weight:-- 2,100 pounds/LCY <br />Material description : T <br />Earth - Loam <br />Rated payload. 75,000 pounds <br />Payload capacity : 35.71 `LCY <br />Struck volume : 24.00 <br />_ LCY <br />m <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity : 29.00 LCY •" <br />hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (t): 8,000 <br /> Scraper Push dozer Source <br />Scraper loading time 1.00 minutes - Altitude adj.:, 0.980 ! NA I <br />._.... <br />--- <br />---- (Cat HB) <br /> <br /> <br />Maneuver and spread time : 0.60 minutes <br /> <br />Job efficiency .4 <br /> <br />0.830 - <br />- <br />- <br />NA -----_-..-----..... <br />-- <br />(Cat HB) <br />' load time per scraper pair on push-pull models Net correction : 0.813 NA <br />Travel time : <br />Road condition description : Firm, smooth, rolling, dirt/!t. surfaced, watered, maintained <br />_...__. <br />___._._....___........... <br />Haul Route : <br />Seg. # ? Haul distance (feet) Grade (%) j Roll. res. Total res. (%) Velocity (fpm) 1 Travel time <br />1 3,000 2.00 3.00 5.00 1867 1 1.73 <br />Return route : <br />Haul time : 1.73 minutes <br />" travel time for each segment is adjusted for acceleration/deceteration. Return time : f,14 minutes <br />table velocities are max attainable <br />per total resistance shown, not average .......... ...•_- <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 4.47 minutes <br />Unadjusted unit production/hour : 778.57 LCY/hour Adjusted for job conditions : 633.29 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 633-29 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 1,266.5$ LCY/hour
The URL can be used to link to this page
Your browser does not support the video tag.