My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-06_REVISION - C1982057
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2008-08-06_REVISION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:15 PM
Creation date
8/11/2008 9:34:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
REVISION
Doc Date
8/6/2008
Doc Name
Midterm Review Reclamation Cost Estimate
From
DRMS
To
Seneca Coal Company
Type & Sequence
MT5
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinai Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 015 State : Colorado Permit/job# : C-1982-057 <br />Date : 0810612008 County: Routt Abbreviation :none <br />_ <br />User: - JRS Site : Seneca !i-W Mine Filename : C-057-015 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2008 Midterm Review <br />Task description : Grade Facilities Area Surface Material Into Fill <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D11 R - 11 U (2005) <br />---- --- Horsepower : 850 <br /> ------------- <br />Blade type : Universal <br /> Attachment no. 1 ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : 3-5hank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $174.40 NA <br /> Operating cost/hour : $225.78 100 <br /> Ripper op. cost/hour : $0.00 p <br /> Operator cost/hour : $32.78 NA <br /> Total unit costihour : $432.96 Tota l fleet cost/hour : $1,731.83 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 28,233 LCY factor : NA volume : 28,233 LCY <br />Source of estimated volume : Division Estimate <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.80 (Cat HS) <br />Unadjusted hourly production : <br />- 2,870.3 LCY/hr Dozing method : <br />---- <br />-- 1-00 (gen ) <br /> Visibility: 1,00 (avg.) <br /> <br />Material consistency description : _ ....... <br />Job efficiency : ................. <br />0.83 <br />(lshiftlday) <br />Dry, non cohesive <br />Spoil pile : <br />0.80 <br />(fnd ffl <br /> Push gradient : 1.00 (Cat HS) <br />Average push gradient : 0.00 % (pos) Altitude : 100 (Cat HB) <br />Average site altitude 7,200 Feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/15U/U) <br /> <br />Material weight : -------- <br />2,-550 lbs/LCY Net correction : --- --------------- .. <br />0.36 .....------------------------ <br />Weight description : <br />Gravel_ Dry <br />- <br />Adjusted unit production : <br />1031.04 <br />LCY/hr <br /> Adjusted fleet production : 4,124.18 LCY/hr <br />JOB TIME AND COST <br />Fleet size : - 4 Dozer(s) Total job time : 6.85 Hours <br />Unit cost : $0.420 /LCY Total job cost : $11,856
The URL can be used to link to this page
Your browser does not support the video tag.