Laserfiche WebLink
CIRCES Cost Estimatina Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # 014 State : Colorado Permit/job# : C-1982-057 <br />Date:_ -081056008_ County :Routt Abbreviation :none <br />- M -? <br />User : JRS Site :Seneca Filename : C057-014--?Y - <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2008 Midterm Review --- <br />Task description: Doze Adjacent South Sage Creek Pit Spoil Ridges - - <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11 R - 11 U (2005) Horsepower : 850 <br />Blade type : Universal -- "'- -" <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. Z :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour. $1 <br />74.40 NA <br />- - <br /> Operating costihour : _ <br />$225.78 --- --___-100 <br /> Ripper op. cost/hour : $0.00 j 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $432.96 Total fleet cost/hour : $1,731.83 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 509,300 LCY factor : NA volume : 509,300 LCY <br />Source of estimated volume : Division Estimate <br />Source of estimated swell factor : NA _.__ ._._....___.._.._.-....___.__._ <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : <br /> <br />j 250 feet - <br />Material consistency ; <br />120 - - " <br />(Cat HB) <br />Unad <br />usted hour) <br />y production : <br />1,264.9 LCY/hr <br />Dozing method : <br />--- <br />1.10 <br />-------_-- ---- - <br />(50% sl) <br />._ <br />._ <br />--- , <br /> <br />Visibility : <br />1.00 . <br />- <br />. -- - <br />(avg.) <br />Material consistency description <br /> <br />Y P <br />- <br />Job efficiency : <br />"°--- "---- <br />0.83 <br />-` - -- - <br />(1 shift/day) <br />Loose stockpile <br /> <br /> <br />_ <br /> <br /> <br /> <br />........ _. ------ -- <br />- <br /> <br />Spoil pile : <br />- -------- <br />- <br />0.90 <br />-------- <br />-- -- <br />(ssd fc) <br />F <br /> Push gradient : --- <br />1 33 (Gat HB) <br />Average push gradient : 15.00 % (neg) Attitude : 0.93 (Cat HB) <br />Average site attitude : 8.000 feet <br />__.-- -- <br />Material weight : <br />0.90 ?_-- <br />(Cat i4s <br /> Blade type : 1.00 (S/S(J/U) <br />Material weight : 2,550 Ibs/LCY i - <br />Net correction : - - -.....__- <br />0.82 __-- <br />Weight description : -.- __.-------------.--- __. <br />Sandstone Adjusted unit production 1042.48 LCY/hr <br /> Adjusted fleet production : 4,169.92 LCY/hr <br />JOB TIME AND COST <br />Fleet size : d Dozer(s) Total job time : 122.14 Hours <br />Unit cost : $0.415 /LCY Total job cost $211,521