Laserfiche WebLink
III. Comments - Compliance <br /> Below are particular issues > ith regard to any of theabove compliance items. Enforcement <br /> actions resulting from failure to comply ;,ith the Act, 'Rules and Regulations, and the permit <br /> also are identified below. <br /> 1. Water was being discharged at the second sediment pond below the refuse pile. The <br /> water was flowing via the temporary ditch to the third pond . The pipe between the <br /> ponds to convey flow remains frozen despite the operators efforts to melt the ice. <br /> 2. The slide area above the rock tunnel was observed. The water tank that supplies <br /> water to the rock tunnel had discharged most of its water into the small slope <br /> between it and the tunnel entrance due to breakage of the supply <br /> 9 pp y pipes. The <br /> operator constructed a small road up to the tank in order to correct the problems <br /> with the hoses and to temporarily haul water to the supply tank. Some aspen trees <br /> were dozed over during the road construction. The slope which had become saturated <br /> moved slightly downhill . This area must be reclaimed this spring once the problem <br /> with the supply pipes has been corrected. <br /> i <br /> i <br />