My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
- 7/17/2008, 11:32:09 AM-JWD
DRMS
>
Public
>
- 7/17/2008, 11:32:09 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 7:44:29 AM
Creation date
7/17/2008 2:14:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
Permit File
Doc Date
7/1/2008
Doc Name
New NOI- Non. Conf.
From
AMSO
To
DRMS
Email Name
SSS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE INFORMATION ON T a HIS PAGE DOES NOT NEED TO BE HELD CONFIDENTIAL <br /> Exhibit C-AMSO,LLC Notice of Intent Supplemental Information <br /> • DRILL PAD HB <br /> HB-1 (See Figure C.6 in this section) <br /> Horizontal Bore Hole 1 <br /> • Drill a 24"diameter hole a minimum of 20 feet with at least 5 feet into competent <br /> bedrock. Historically, surface casing holes have been 40 to 60 feet deep. <br /> (Mud,Air or Air/Foam) <br /> • Run 20", 94#J-55 Surface Casing. <br /> • Cement with"Neat Cement"to surface. <br /> • Rig up diverter and wait on cement a minimum of 4 hours. <br /> • Drill out from surface casing with 19"diameter bit to a depth of—817 feet. <br /> • Trip out of the hole and run a multi shot survey or gyro survey. <br /> • Trip in the hole with a mud motor and a19"bit. Utilize the mud motor and <br /> surveys to drill a curve with a radius of 1327.2 feet. Complete directional surveys <br /> every 20 feet. Drill to horizontal. Target hole(T-1)should be—50 feet away. <br /> • Condition the hole,Trip out of the hole and run 16",754,K-55 casing. <br /> • Cement with Type I or II Portland Cement with 2%bentonite to surface. <br /> Wait on cement 12 hours. <br /> • Directional drill a 14"hole—50 feet and intersect the T-1 open hole. Continue to <br /> drill an additional 50 feet past the vertical intercept. <br /> • Circulate the hole and monitor fluid levels in the T-1 hole to verify <br /> communication between T-1 and 1113-1 drill holes. <br /> • Move drill rig to HB,-L3 hole. <br /> • <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.