Laserfiche WebLink
7 <br />7. List the seed mixture to be used in the re-establishment of vegetation. See the attached seed mixture calculation to obtain <br />PLS/acre. For assistance with formulating seed mixtures and rates, contact the local 'MRCS if on private land, BLM/USFS if <br />on public land or State Land Board if on. state land. <br />A. Provide plant name and seeding rate <br />l Plant Name i Seeding Rate (PLS/acre) <br />t <br />i <br />Pending from the BLM j <br />E d t <br />( i <br />i i <br />( 1 ; <br />it f <br />t <br />I ; <br />1 i <br />1 <br />s <br />+ <br />i <br />s 3 ? <br />t? F <br />B. Describe the method for seed bed preparation, and application method for grass/forb seeding: <br />The seedbed will be prepared by roughening with a backhoe then <br />reseeded and covered by hand raking or four-wheeler and harrow leaving a roughened surface. <br />obstacles would be place to preclude travel along the reclaimed route. <br />V. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS: <br />1. Reclamation measures shall be fulfilled in a timely manner and completed within five (5) years of completion of prospecting <br />activities. <br />1 T lie prospecting operations described in this Notice will be conducted in such a manner as to minimize surface disturbances. <br />In addition to the measures required in Rule 5, precautions to be taken include: <br />A. Confinement of operations to areas near existing roads or trails, where practicable. Existing roads which are to remain as <br />permanent roads after prospecting activities are completed shall be left in a condition equal to or better than the pre- <br />prospecting condition; <br />B. Drilling shall be conducted in such a way as to prevent cuttings and fluids from directly entering any dry or flowing <br />stream channel. Drill cuttings must be. spread to a depth no greater than one-half 0r2) inch or buried in an approved <br />disposal pit,