My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 5/28/2008, 10:12:00 AM-JWD
DRMS
>
Public
>
PERMIT FILE - 5/28/2008, 10:12:00 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:31 PM
Creation date
5/28/2008 1:27:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008022
IBM Index Class Name
PERMIT FILE
Doc Date
5/21/2008
Doc Name
New NOI to Conduct Prospecting
From
Homeland Uranium, Inc.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />6" of topsoil exist. if topsoil is striped it will be stockpiled in windrows on the <br />uphill side of the disturbed area. Blading or grading is not proposed at the drill <br />sites unless the drill site is not level enough to accommodate the drilling rig. If <br />leveling is required the drill site would be 20 -feet in width and 40-feet in length <br />and accommodate the rig, water storage, drilling equipment, drilling supplies and <br />multiple crew vehicles. The rig would be oriented to minimize surface disturbance and <br />insure the most level area possible. Minor cuts and fills may be generated and have been <br />included in the disturbance estimate within the 20, by 40, area. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Providing that no water is encountered while drillin the hole would be back-filled <br />and a nonmetallic surface plug would be installed in the hole. In the event that water <br />is encountered during drilling, bentonite chips would fill the abandon hole and a 10' <br />cement cap placed over the bentonite chips to surface. Should an alternate plugging <br />method be requested by the BLM that procedure would be followed. Drill cuttings would <br />be spread over the surrounding area. <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />No other disturbances are ro osed exce t for drill holes and access roads. <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />New roads_ will be reshaped to original contour and roughened with a backhoe then _reseeded and covered by hand raking or four-wheeler and harrow leaving a roughened surface. <br />Obstacles would be place to preclude travel along the reclaimed route` Existing roads <br />would be reclaimed utilizing the same procedure unless directed to leave the existing <br />roads open by the BLM.
The URL can be used to link to this page
Your browser does not support the video tag.