My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-28_REVISION - M1977493 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2008-02-28_REVISION - M1977493 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:04 PM
Creation date
5/30/2008 8:24:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
2/28/2008
Doc Name
Certification 3-dam pump station & pipeline, sludge densification plant & pipeline (part 2)
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR7
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#3 Dam Seepwater Pump System <br />for <br />Climax Molybdenum Company <br />Climax Mine <br />by <br />W. W. Wheeler and Associates, Inc. <br />Exponential Engineering Company <br />J. C. Baur and Associates <br />LYNTEK Incorporated <br />LEADVILLE <br />a <br />PROJECT LOCATION 2 <br />EAGLE PARK <br />IV /- RESERVOIR <br />ROBINSON <br />RESERVOIR <br />HIGHWAY 91 <br />CLIMAX MILL--' <br />it <br />II <br />CLINTON GULCH RESERVOIR, <br />II <br />!I <br />I <br />I <br />?ROBINSON TAILING POND <br />?TENMILE TAILING POND <br />MAYFLOWER <br />JJJ X", TAILING POND <br />tiny ?'?qr 9, 7 PEAKS <br />1fi <br />vlz <br />VAIL PASS <br />SICOPPER MOUNTAIN <br /> <br />FRISCO e <br />VAIL <br />6 MILES <br />DILLON <br />HIGHWAY 9 <br />RECORD DRAWINGS <br />THESE RECORD DRAWINGS HAVE BEEN PREPARED, IN PART, BASED ON <br />INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED <br />TO BE RELIABLE,. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE <br />ACCURACY OF THESE RECORD DRAWINGS, OR FOR ANY ERRORS OR <br />GENERAL LOCATION MAP <br />i <br />NOT TO SCALE <br />OMISSIONS THAT MIGHT HAVE BEEN INCORPORATED INTO THEM AS THE <br />RESULT OF INCORRECT INFORMATION PROVIDED TO THE ENGINEER. THOSE <br />RELYING ON THESE RECORD DRAWINGS ARE ADVISED TO OBTAIN <br />INDEPENDENT VERIFICATION OF THEIR ACCURACY. <br />DRAWING INDEX <br />DWG. N07DESCRIPTION <br />D3PS-X-01 PROJECT COVER SHEET - LOCATION MAP AND DRAWING INDEX <br />I D3PS-D-01 I PIPING AND INSTRUMENTATION DRAWING <br /> D3PS-G-01 PUMP STATION AND RETURN PIPELINE - OVERALL PLAN VIEW <br /> D3PS-G-02 PUMP STATION AREA - SITE PLAN <br /> D3PS-G-03 PUMP STATION -PLAN VIEW <br /> D3PS-G-04 PUMP STATION - SECTIONS <br /> D3PS-G-05 SPILLWAY STRUCTURE - PLAN AND SECTIONS <br /> D3PS-G-06 PUMP STATION AREA - WATER HANDLING CONCEPTS <br /> CIVIL <br /> D3PS-C-01 GEOTECHNICAL TEST HOLE AND PIT LOGS <br /> D3PS-C-02 PUMP STATION SITE GRADING PLAN <br /> D3PS-C-03 COLLECTION POND - SECTIONS AND DETAILS <br /> D3PS-C-04 PIPELINE SECTIONS AND DETAILS <br /> D3PS-C-05 PIPELINE - CLEANOUT DETAILS <br /> D3PS-C-06 PIPELINE - SECTION AND DETAILS <br /> D3PS-C-07 PIPELINE PLAN AND PROFILE - STA 0+00 TO 15+00 <br /> D3PS-C-08 PIPELINE PLAN AND PROFILE - STA 15+00 TO 30+00 <br /> D3PS-C-09 PIPELINE PLAN AND PROFILE - STA 30+00 TO 45+00 <br /> D3PS-C-10 PIPELINE PLAN AND PROFILE - STA 45+00 TO 60+00 <br /> D3PS-C-11 PIPELINE PLAN AND PROFILE - STA 60+00 TO END <br /> D3PS-C-12 PIPELINE - SURVEY POINT DATA <br /> STRUCTURAL <br />i <br />D3PS-S-01 <br />COVER SHEET - STRUCTURAL NOTES <br /> D3PS-S-02 PUMP STATION - FOUNDATION PLAN <br /> D3PS-S-03 PUMP STATION - ELECTRICAL ROOM FRAMING PLAN <br /> D3PS-S-04 PUMP STATION - ROOF FRAMING PLAN <br /> D3PS-S-05 PUMP STATION - FOUNDATION DETAILS <br /> D3PS-S-06 NOT USED <br /> D3PS-S-07 PUMP STATION - FRAMING DETAILS <br /> D3PS-S-08 PUMP STATION - FRAMING DETAILS <br /> D3PS-S-09 PUMP STATION - DIAGONAL BRACING PLAN <br /> D3PS-S-10 CONCRETE DETAILS - SPILLWAY STRUCTURE. PLAN de ELEV. <br /> D3PS-S-11 CONCRETE DETAILS - MIX BOX MODIFICATIONS <br />j D3PS-S-12 CONCRETE DETAILS - TRANSFORMER PAD <br /> D3PS-S-13 TENMILE TUNNEL CULVERT - PLAN, SECTION AND DETAILS <br /> D3PS-S-14 5 DAM PIPELINE DISCHARGE STRUCTURE - PLAN AND SECTION <br /> D3PS-S-15 PIPE CLAMPS, ORIFICE PLATE - PLAN, SECTION, DETAILS <br /> D3PS-S-16 NOT USED <br /> D3PS-S-17 12" CHECK VALVE LEVER CAGE - GA AND DETAILS <br /> D3PS-S-18 COLLECTION CHAMBER PIPE SUPPORT - GA AND DETAILS <br /> D3PS-S-19 MISCELLANEOUS DETAILS <br /> 03PS-S-20 MIX BOX DETAILS <br /> D3PS-S-21 CHECK VALVE SUPPORT - GA AND DETAILS <br /> ARCHITECTURAL <br /> D3PS-A-Ot PUMP STATION ARCHITECTURAL - BUILDING ELEVATIONS <br /> D3PS-A-02 WEIR BOX BUILDING - PLAN AND SECTIONS <br /> D3PS-M-01 PUMP STATION PIPING - PLAN, SECTIONS AND DETAILS <br /> D3PS-M-02 PUMP STATION PIPING - MISCELLANEOUS DETAILS <br /> D3PS-M-03 PUMP STATION PIPING - MISCELLANEOUS DETAILS <br /> D3PS-M-04 MATERIAL CONTROL - CIVIL/STRUCTURAL/MECHANICAL <br /> D3PS-M-05 LIME STORAGE TANK - DETAILS AND DATA <br /> .D3PS-M-06 PIPING PLAN VIEW - 3 DAM SLUURY TANK AND PUMPS <br /> D3PS-M-07 PIPING ELEVATION - 3 DAM SLURRY TANK AND PUMPS <br />D3PS-E-01 ELECTRICAL SYMBOLS, ABBREVIATIONS, CONTROL SCHEMATIC SYMBOLS <br />D3PS-E-02 ELECTRICAL SYMBOLS. ABBREVIATIONS, CONTROL SCHEMATIC SYMBOLS <br />03PS-E-03 ONE LINE DIAGRAM <br />D3PS-E-04 13.8 KV DISTRIBUTION LINE DESIGN <br />D3PS-E-05 13.8 kV DETAILS <br />D3PS-E-06 13.8 kV DETAILS <br />D3PS-E-07 SITE PLAN AND GROUNDING PLAN <br />D3PS-E-08 480 VOLT AND CONTROL PLAN <br />D3PS-E-09 208/120 VOLT POWER PLAN <br />D3PS-E-10 NOT USED - <br />D3PS-E-11 WEIR BUILDING <br />D3PS-E-12 PANEL SCHEDULES <br />D3PS-E-13 MCC PLAN AND ELEVATION <br />D3PS-E-14.1 ELECTRICAL DETAILS <br />D3PS-E-14.2 ELECTRICAL DETAILS <br />D3PS-E-15.1 I GROUNDING DETAILS - SHEET 1 <br />D3PS-E-15.2 GROUNDING DETAILS - SHEET 2 <br />D3PS-E-16 NOT USED <br />D3PS-E-17.1 CONDUIT SCHEDULE - SHEET 1 <br />D3PS-E-17.2 CONDUIT SCHEDULE - SHEET 2 <br />D3PS-E-18.1 ELECTRICAL MATERIAL - SHEET 1 <br />D3PS-E-18.2 ELECTRICAL MATERIAL - SHEET 2 <br />D3PS-E-19 ELECTRIC MOTOR SCHEMATICS <br />03PS-E-FAP FIRE DETECTION SYSTEM - WIRING DIAGRAM <br />ofuwxara. MRRENCE Ms drewmg fogefherwdh ds pamd eledr media No wo are uaoB er am.er Ress.Ris Fie R-d R°md By O.b _J W. W. UNWWWOed'•wau.W 11 <br />e Mana <br />ement Project <br />Climax Slud <br />E <br /> <br /> <br />sdefes, LW- <br />is the popafy of W W VNreabr 6A sw? <br />Rd.«d biCam.dw6dbm <br /> <br />"".° <br />? <br />o.?n <br />g <br />g <br />uwmAesouraes <br />nglnem <br />ey.mare.r emfa <br /> othm -pfedamcarmdedhymdtenagrwmerd RECORD `n <br />Z e <br />a"'06 <br />°G" <br />W. 21 <br />?p sM +a CGnfax Mine <br />CLIENT: ClimaxNblybdenumCo <br />-Climaz <br />CO <br /> dhlhedid NSredmfnemreeloc! Ifi ft-sdenMe <br />a DRAWNG O B iaeoCf w. SW Ft-. irwny. ym g? Ch.a t- aea <br />P <br />S <br />#3 D <br />S <br />t <br />t . <br />, <br /> arp condition that it shad not he mpduced. coped. ' <br />> er <br />ump <br />ys <br />em <br />am <br />eepwa 23 <br />01 <br />1051 No <br />Drawing <br /> Rpusedra.nr dherpaReseManMRmwd;s DATE: tonoro7 Project Cover Sheet . <br />. D3PS <br />1 <br />Q <br /> v.-fi Ily ftMshedwf-A thepwrw+ilfen--wa nR.ase.we r Location Map and Drawing Index sw - <br />X.' <br /> said W W rtifieeW &ft edeln. <br />r NONE <br /> <br />W <br />U <br />Z <br />W <br />X <br />W <br />w <br />X <br />B <br />
The URL can be used to link to this page
Your browser does not support the video tag.