Laserfiche WebLink
3 DAM FIELD PROCESS AREA 3 DAM SCADA CONTROL PANEL SDP SCADA CONTROL PANEL SDP SCADA COMPUTER <br />TO COLLECTION <br />CHAMBER AT SDP <br />MAGMETER <br />SOURCE WATER FROM <br />3 DAM VERTICAL <br />TURBINE PUMPS <br /> 1? <br />II <br />NOTE: INSTALL DATA AND POWER <br />CONDUCTORS IN SEPERATE CONDUITS <br />I <br />I <br />I <br />120 VAC <br />SP <br />5209 <br />ANALOG INPUTS <br />TB4 <br />P10 <br />---? C A 0 --- A N0A-0 <br />T84.1 ? GND <br />TO NEXT SP <br />TERMINAL BLOCK 5209 <br />CONTROLLER <br />COM3 <br />SP <br />5209 RJ45 <br />CONTROLLER <br />P7 PP77 <br />P7 Rldl 51 F----0n r---P-1 RJ451 <br />RS-232 <br />Iz I I Iz <br />Uj I = <br />t7i <br />E1 E1 <br />ETHERNET/FIBER ETHERNET/FIBER <br />SWITCH SWITCH <br />RJ45 RJ45 <br />FIBER <br />TX SC OPTIC <br />Sc <br />FIBER <br />RX SC OPTIC <br />SC <br />FLOW : SOURCE WATER FROM 3 DAM PUMPS TO SDP COLLECTION CHAMBER. <br />SET POINT : NONE <br />ALARM HIGH HIGH : NONE <br />ALARM HIGH : NONE <br />ALARM LOW : NONE <br />ALARM LOW LOW : NONE <br />INTERLOCK : NONE <br />CONTROLS : NONE <br />REFERENCE DRAWING5 <br />THIS DRAWING WAS PREPARED BY LYNTEK. ALL OF THE <br />INFORMATION CONTAINED THEREIN IS THE PROPERTY OF <br />LYNTEK AND NO REPRODUCTION CAN BE MADE WITHOUT <br />THE PROPER WRITTEN AUTHORIZATION OF LYNTEK. <br />?J <br />0 <br />© CLIMAX MOLYBDENUM <br />A Subsidiary of Phelps Dodge Corporation <br />SLUDGE MANAGEMENT PROJECT <br />3 DAM PUMP STATION <br />CONTROL LOOP 762 <br />INCORPORATED <br />7D-oP G.NcCash 07 31 O6 <br />XD. K. LENS 07/31/06 081 406.1330 <br />05018-1-9910